These are after I had already removed most of the caulking and had stripped the thing twice already.
These last pictures are after 5 strippings (by hand, I might add - after finishing the 5th stripping I was cleaning things up in the bathroom and found 3 steel wool pads for my little sander...UNBELIEVABLE) and then the priming, painting and caulking. This is after 1 1/2 weeks of work and waiting for things to cure...